Lakshmi Kurpa

ACTUAL PHOTOS


Specifications



Structure :

RCC framed structure


Walls :

Stock brick/ fly ash cement bricks/Aerocon block in cement mortar


Doors:

Main door in teak wood frame & shutters and other doors in country wood with flush type shutters


Windows :

Good quality UPVC /Aluminum windows with glazed shutters


Kitchen :

Polished granite platform with stainless steel link and ceramic tiles dadoing


Toilet :

Ceramic tiles flooring with good quality parry ware/Hind ware/Kohler or equalent make sanitary fittings and Jaguar or equalent make plumbing fitting.


Flooring :

Vitrified tile flooring inside the flat


Electricity :

Three phase electric supply with concealed ISI make FRLS copper wiring, circuit breaker and A/C points in all bedrooms


Finishing :

Walls with putty to take emulsion paint and ceiling plastered suitable to take cement paint


Polished wood finish; outer walls - exterior emulsion


Water Supply Arrangements :

Bore well for tapping ground water. Sump to store water with arrangements for pumping water to overhead tank, lines run from these tanks to each flat


Lifts :

5 passenger lift of reputed make


Schedule of Payment



  • At the time booking :50%t
  • Foundation Stage :20%
  • Respective Roof slab completion :15%
  • Flooring Stage :10%
  • At the Time of handing over :05%

Extra Expenses



  • Registration Charges
  • Legal fees, Documentation and other incidental charges
  • Service connection charges, deposits, fees, and incidental expenses for Water supply and drainage connection, electricity connection
  • Sales Tax, Vat, Infra structure charges and any other charges as imposed by the Govt

TYPICAL FLOOR PLAN 1ST & 2ND FLOOR